Custom Home Builder in Burnaby, BC

Knockdown-rebuilds of Burnaby's post-war and 1970s houses, new custom homes on view lots in the Heights and Westridge, laneway homes and suites where the City allows them, and small multiplexes on qualifying lots. Built by a BC Housing licensed residential builder, starting with a zoning check on your address.

BC Housing licensed residential builder2-5-10 home warranty on every new homeStep Code planned from the first drawingItemized written quotes
A new custom home with large windows under construction on a sloped Burnaby, BC lot with mountain views to the north

Burnaby's single-family neighbourhoods were mostly built between the 1940s and the 1970s, and many of those houses are now worth less than the land under them. That makes knockdown-rebuilds the typical custom home project here, from the north-facing view lots of Capitol Hill and Westridge to the larger lots around Deer Lake and the sloping streets of the South Slope. The rules have also changed: the City has introduced laneway homes and expanded suite options, and the province's small-scale multi-unit housing legislation has opened more possibilities on many lots, within the City's zoning. This is the booking line for one BC Housing licensed residential builder working across Burnaby, who checks your lot's zoning, slope and trees before any design.

Local Knowledge

Building in Burnaby: Lots, Permits, Warranty and Energy Rules

Slopes and views. Burnaby is built on hills. Capitol Hill and the Burnaby Heights look north over Burrard Inlet to the North Shore mountains, Westridge and Lochdale climb toward Burnaby Mountain, and the South Slope falls toward the Fraser. Sloped lots allow walk-out lower floors and suites, but they also bring excavation, retaining walls, drainage and geotechnical work, and the City's height rules are measured against the grade. A survey and early engineering advice keep the design realistic.

Laneway homes, suites and more units. Burnaby now allows laneway homes and secondary suites on many single-family lots, and provincial legislation passed in 2023 required the City to allow more units on many lots. The City has its own zoning, size limits and design requirements for each option, and they continue to evolve. What your lot can hold, and in what combination, is checked with the City for your address before design starts.

Licensing and the 2-5-10 warranty. In BC, a new home must be built by a residential builder licensed with BC Housing, and it must be covered by third-party home warranty insurance under the Homeowner Protection Act. The standard coverage is known as 2-5-10: two years on materials and labour, five years on the building envelope including water penetration, and ten years on the structure. You can look up a builder's licence in BC Housing's public registry before you sign anything, and you should. Owner-builder authorization is a separate route with its own requirements, including an exam.

Step Code: how energy rules shape the design. New homes in BC are built to the BC Energy Step Code, which sets energy performance levels in steps. The provincial minimum went up in 2023, and many municipalities, including several in the Lower Mainland, require a higher step or a low-carbon heating system. In practice that means an energy advisor models the house at the drawing stage, and the house is tested for airtightness during and after construction. Designing for it from the start costs much less than fixing a design that misses the target at permit time. the City of Burnaby confirms the step your project needs.

Before the excavator: hazmat survey, trees and permits. If the house on your lot was built before 1990, WorkSafeBC's asbestos requirements call for a hazardous materials survey by a qualified person before demolition or renovation, and asbestos found in it is removed by a licensed abatement contractor before the building comes down. Most municipalities want that survey with the demolition permit. Protected trees usually need a permit and an arborist report, and services such as water, sewer and storm connections are often renewed for a new house. None of this is unusual, but all of it takes time, so it goes into the schedule from the first meeting.

Builder licensing, the public licensed builder registry, owner-builder authorization and home warranty insurance are administered by BC Housing. Energy performance requirements are set out in the BC Energy Step Code and the BC Building Code. Hazardous materials surveys and asbestos abatement are covered by WorkSafeBC's asbestos requirements. Zoning, permits, tree protection and servicing for your address are decided by the City of Burnaby. Nothing on this site is legal or planning advice; confirm your project's requirements with the municipality.

Questions

Frequently Asked Questions

Do I need a licensed builder for a new house in BC?

Yes, unless you qualify and are approved as an owner-builder. A new home must be built by a residential builder licensed with BC Housing and covered by home warranty insurance. Ask for the licence and check it on BC Housing's registry.

What does the 2-5-10 warranty cover?

Two years on materials and labour, five years on the building envelope including water penetration, and ten years on the structure, subject to the policy's terms. The warranty is provided by a third-party insurer, not by the builder alone.

How much does it cost to build a custom home in Burnaby?

It depends on size, design, finishes, the lot and the energy step required. Broad per-square-foot estimates are on the cost page. A real number comes from drawings and an itemized quote.

How long does a custom home take?

Design and permitting often take many months, and construction commonly takes a year or more, depending on the size of the house, the lot and how long the City of Burnaby takes to issue permits. The schedule is set out at the start and updated as it moves.

Can you work with my own architect or designer?

Yes. Many projects come with drawings from an architect or designer. Others start with design-build, where design and construction are planned together around the budget.

What zoning allows on my lot?

Only the City of Burnaby can answer that for a specific address. Provincial rules introduced in 2023 and 2024 mean many lots that were single-family now allow suites or more units, but the details depend on lot size, location and local zoning. A zoning check is the first step, before any design.

Ready to Get Started?

Call 778-900-8907 or send the form for a written quote for custom home building in Burnaby.

By submitting this form, you agree to be contacted by phone, text, or email about your request. You can opt out at any time. Your details go only to the one local licensed residential builder who handles your job — nobody else.

Call Now: 778-900-8907